Shipping, MOQ & Payment Terms

Container loading figures, minimum order quantities, FOB and CIF terms, lead times and payment terms — the practical side of ordering tires from China.

Small quantities, mixed containers, and honest lead times. Most of our first orders are 4–6 sizes, a few hundred pieces each, in one 20GP. Below is what the minimum actually is, how we load a mixed container, and who pays for what.

Minimum order quantity — the real numbers

MOQ depends on whether your size is currently running, not on a fixed catalogue rule.

Order type MOQ Notes
Mixed sizes, small batch 100–200 pcs per size Four to six sizes combined in one shipment. This is the normal first order.
Single size, small batch 500 pcs Cheaper per piece, but you carry the stock risk on one size.
Private label, level 1 200–500 pcs per size Engraved insert only; existing mould.
New mould / new tread 2,000+ pcs per size Tooling quoted separately, sometimes refundable against volume.
Inner tubes 200–500 pcs Can be loaded into the gaps of a mixed container at almost no freight cost.

Mixed containers: how it works in practice

A 20GP holds roughly 400–600 small tires, or 200–300 wheel assemblies, or a mix of both. A 40HQ roughly doubles that.

Because a mixed order’s freight cost is decided by how cartons stack, we calculate cubic metres per item and propose a loading plan before you confirm. If your order does not fill a container, we tell you which sizes to add to reach a sensible load — usually the small, high-density items like inner tubes and 3.50-4 wheels.

Item type Typical packing Stacking note
Bare tires (small) Nested, strapped bundle Highest density per cubic metre — good for filling gaps
Wheel assemblies Individual carton or pair Heavier, must go low and centre
Inner tubes Poly bag, 10–25 per carton Fills voids around cartons at almost no cost
Wrapped pallet ready for loading
Pallets wrapped, strapped and labelled before loading.
Finished stock in the warehouse
Finished stock held in the warehouse.
Pallets stored outside the factory
Outdoor staging area before container pickup.

Lead time

Situation Lead time after deposit
Size already in production 20–25 days
Mould needs mounting 25–35 days
Wheel assemblies (assembly + checks) 30–35 days
New mould 45–60 days

We quote a production window rather than a fixed date, because a small order runs inside a larger batch of the same size. If a date is critical, tell us at inquiry — we will tell you which sizes can hit it.

Payment

  • First order: 30% deposit, 70% against the bill of lading copy. T/T.
  • Repeat orders: terms can be discussed after two clean shipments.
  • L/C at sight: accepted above USD 30,000.

Ports and terms

Term Details
FOB Qingdao (all sizes). Ningbo or Shanghai on request.
CIF / CFR Quoted to your port on request — we work with forwarders on European, African and South American lanes.
EXW Available if you have your own forwarder in Qingdao.

Documents supplied

  • Commercial invoice and packing list
  • Bill of lading (original or telex release)
  • Certificate of origin (Form A / FTA on request)
  • Loading photos: cartons, labels, container stack
  • Test reports or material certificates on request

What we will tell you before you commit

  • Whether your size is on a mounted mould, and when it next runs
  • The actual minimum we can run, not a catalogue figure
  • Whether your quantity fills a container, and what to add if it does not
  • Whether your hub and bearing position need a new fixture

Send your size list, quantities and destination port — we will reply with a loading plan and a realistic date, not a generic price list.

Scroll to Top
Chat on WhatsApp