{"id":178,"date":"2026-11-21T13:44:38","date_gmt":"2026-11-21T13:44:38","guid":{"rendered":"https:\/\/soiltread.com\/blog\/sourcing-timeline-case-study\/"},"modified":"2026-11-21T14:16:31","modified_gmt":"2026-11-21T14:16:31","slug":"small-mixed-order-factory-process","status":"publish","type":"post","link":"https:\/\/soiltread.com\/pt\/blog\/small-mixed-order-factory-process\/","title":{"rendered":"How a Small Mixed Order Actually Runs Through a Tire Factory"},"content":{"rendered":"<h2>How a Small Mixed Order Actually Runs Through a Tire Factory<\/h2>\n<p>Most sourcing guides describe the ideal order: one size, one container, one payment. Real first orders rarely look like that. They look like five sizes, eight hundred pieces in total, half of it wheel assemblies, and a buyer who needs to see what sells before committing to a container of anything.<\/p>\n<p>This article walks through how an order like that is actually scheduled in our plant \u2014 what happens in each week, where the delays come from, and what you can do to shorten it. No customer details, no case-study theatre: just the process.<\/p>\n<h2>Week 1: the inquiry is checked against moulds, not against a catalogue<\/h2>\n<p>The first thing that happens to a mixed inquiry is not pricing. It is a mould check, size by size.<\/p>\n<p>For each tire size we need to know three things:<\/p>\n<ul>\n<li>Is the mould mounted in a press right now?<\/li>\n<li>If not, is it available in the mould store, or is it in another customer&#8217;s press?<\/li>\n<li>Is it within its service life, or worn enough to affect OD?<\/li>\n<\/ul>\n<p>For each rim we check the die, and for each assembly we check the hub fixture \u2014 specifically whether it can press bearings asymmetrically, because a lot of standard fixtures cannot.<\/p>\n<p>This is the stage where we tell you the truth about what is quick and what is not. A size with a mounted mould can start in days. A size whose mould needs mounting adds one to two weeks. A size with no mould at all is a tooling conversation.<\/p>\n<h2>Week 2: quoting, and the loading plan<\/h2>\n<p>Once feasibility is clear, the quote is built item by item, because a wheel assembly and a bare tire have completely different cost structures:<\/p>\n<table>\n<thead>\n<tr>\n<th>Item type<\/th>\n<th>Cost components<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Bare tire<\/td>\n<td>Compound, carcass, curing, trimming, packing<\/td>\n<\/tr>\n<tr>\n<td>Inner tube<\/td>\n<td>Compound, curing, valve fitting<\/td>\n<\/tr>\n<tr>\n<td>Wheel assembly<\/td>\n<td>Tire + rim + bearings + hub tube + pressing + run-out check + packing<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>In the same email we send a loading plan. This matters more than most buyers expect, because a mixed order&#8217;s freight cost is decided by how the cartons stack, not by total weight.<\/p>\n<p>A 20GP holds roughly 400\u2013600 small tires, or 200\u2013300 wheel assemblies, or a mix. Cartons of different sizes do not fill a container efficiently unless somebody plans the stack. We calculate cubic metres per item and propose a split. If your order does not fill a container, we will tell you what to add to reach a sensible load \u2014 usually the sizes that are cheapest per cubic metre.<\/p>\n<h2>Week 3\u20134: sampling, only where it matters<\/h2>\n<p>We do not sample every item. Sampling is only worth the time when something is non-standard:<\/p>\n<ul>\n<li>Hub length or bearing position differs from our standard fixture<\/li>\n<li>The buyer&#8217;s existing rim has to be matched exactly<\/li>\n<li>A brand new mould is involved<\/li>\n<li>The buyer has never imported this type of wheel before<\/li>\n<\/ul>\n<p>For standard sizes with a standard hub, sampling adds two to three weeks and confirms what the drawing already said.<\/p>\n<h2>Week 5\u20138: production, slotted between larger runs<\/h2>\n<p>This is the part buyers find hardest to accept: a small order does not run on its own. It runs inside a larger production slot for the same size.<\/p>\n<p>If we have 3,000 pieces of 15&#215;6.00-6 scheduled for the month, your 200 pieces join that run. You get the benefit of the larger batch \u2014 better compound consistency, lower per-piece cost \u2014 without waiting for a 3,000-piece order of your own.<\/p>\n<p>The trade-off is scheduling: your order starts when the size runs, not when your deposit arrives. That is why we quote a production window rather than a fixed start date.<\/p>\n<p>Tires are cured first, then trimmed and inspected. Rims are stamped and powder-coated separately. They meet at the assembly bench.<\/p>\n<h2>Week 8\u20139: assembly and the checks that matter<\/h2>\n<p>For wheel assemblies, this is where most quality problems are either caught or created.<\/p>\n<table>\n<thead>\n<tr>\n<th>Check<\/th>\n<th>What we do<\/th>\n<th>Why<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Hub length<\/td>\n<td>Caliper across bearing faces, every batch<\/td>\n<td>\u00b10.5 mm tolerance; a wrong hub means the wheel will not fit<\/td>\n<\/tr>\n<tr>\n<td>Bearing seating<\/td>\n<td>Verify flush side and shoulder side against the drawing<\/td>\n<td>Asymmetric hubs are the number one cause of fitting complaints<\/td>\n<\/tr>\n<tr>\n<td>Radial run-out<\/td>\n<td>Max 2 mm, checked on a mandrel<\/td>\n<td>Prevents vibration on faster equipment<\/td>\n<\/tr>\n<tr>\n<td>Lateral run-out<\/td>\n<td>Max 3 mm<\/td>\n<td>Prevents the wheel rubbing the frame<\/td>\n<\/tr>\n<tr>\n<td>Inflation<\/td>\n<td>To rated pressure, 24-hour hold on a sample<\/td>\n<td>Catches bead seating faults before packing<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>Week 9\u201310: packing and loading<\/h2>\n<p>Wheel assemblies are packed individually or in pairs, depending on weight. Bare tires are nested. Inner tubes go in the gaps.<\/p>\n<p>The loading plan from week 2 becomes the packing list now. This is also when we photograph the cartons and the container loading, because &#8220;we shipped what you ordered&#8221; is easier to prove with photos than with an argument three months later.<\/p>\n<h2>What actually determines the timeline<\/h2>\n<table>\n<thead>\n<tr>\n<th>Factor<\/th>\n<th>Effect on lead time<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Size already in production<\/td>\n<td>No delay<\/td>\n<\/tr>\n<tr>\n<td>Mould needs mounting<\/td>\n<td>+1 to 2 weeks<\/td>\n<\/tr>\n<tr>\n<td>New mould or die required<\/td>\n<td>+4 to 6 weeks, plus tooling cost<\/td>\n<\/tr>\n<tr>\n<td>Non-standard hub fixture<\/td>\n<td>+1 to 2 weeks<\/td>\n<\/tr>\n<tr>\n<td>Sampling required<\/td>\n<td>+2 to 3 weeks<\/td>\n<\/tr>\n<tr>\n<td>Buyer feedback loop<\/td>\n<td>Often the largest variable \u2014 days become weeks when questions sit unanswered<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>The last row is worth emphasising. On the orders that run late, the delay is usually not in the plant. It is in the rounds of &#8220;can you confirm this measurement&#8221; that each take a week to come back.<\/p>\n<h2>How to make a small mixed order run faster<\/h2>\n<ol>\n<li><strong>Send the full specification in the first email.<\/strong> Every missing number becomes a week.<\/li>\n<li><strong>State tolerances instead of single values.<\/strong> It removes the sample-and-argue cycle.<\/li>\n<li><strong>Accept a mixed container.<\/strong> It is what makes small quantity viable in the first place.<\/li>\n<li><strong>Decide on samples before production is scheduled<\/strong>, not after.<\/li>\n<li><strong>Nominate one contact<\/strong> who can approve a measurement without consulting three colleagues.<\/li>\n<\/ol>\n<h2>What we can and cannot do<\/h2>\n<p>We can run 100\u2013200 pieces per size for sizes we hold moulds for, mix four to six sizes in one container, assemble tires and rims in-house, and put your brand on the sidewall.<\/p>\n<p>We cannot run a size we have no mould for at short notice, and we will not quote a delivery date before the mould check is done.<\/p>\n<p><a href=\"\/pt\/contact-us\/\">Send your size list and quantities<\/a> \u2014 mixed and small is the normal case here, not a special favour.<\/p>","protected":false},"excerpt":{"rendered":"<p>A week-by-week walk through what happens when an order is five sizes, a few hundred pieces each and half of it wheel assemblies \u2014 mould checks, loading pla<\/p>","protected":false},"author":0,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"seo_title":"How a Small Mixed Tire Order Runs Through a Factory (Week by Week)","description":"A week-by-week walk through what happens when an order is five sizes, a few hundred pieces each and half of it wheel assemblies \u2014 mould checks, loading plans, assembly checks and where delays come from.","keywords":"small tire order factory process, mixed container tire order, tire production lead time, small batch wheel assembly","seo_title_es":"","description_es":"","keywords_es":"","seo_title_fr":"","description_fr":"","keywords_fr":"","seo_title_ru":"","description_ru":"","keywords_ru":"","seo_title_pt":"","description_pt":"","keywords_pt":"","seo_title_ar":"","description_ar":"","keywords_ar":"","title_es":"","excerpt_es":"","content_es":"","brief_es":"","title_fr":"","excerpt_fr":"","content_fr":"","brief_fr":"","title_ru":"","excerpt_ru":"","content_ru":"","brief_ru":"","title_pt":"","excerpt_pt":"","content_pt":"","brief_pt":"","title_ar":"","excerpt_ar":"","content_ar":"","brief_ar":"","footnotes":""},"categories":[68],"tags":[],"class_list":["post-178","post","type-post","status-publish","format-standard","hentry","category-sourcing-guides"],"_links":{"self":[{"href":"https:\/\/soiltread.com\/pt\/wp-json\/wp\/v2\/posts\/178","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/soiltread.com\/pt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/soiltread.com\/pt\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/soiltread.com\/pt\/wp-json\/wp\/v2\/comments?post=178"}],"version-history":[{"count":1,"href":"https:\/\/soiltread.com\/pt\/wp-json\/wp\/v2\/posts\/178\/revisions"}],"predecessor-version":[{"id":183,"href":"https:\/\/soiltread.com\/pt\/wp-json\/wp\/v2\/posts\/178\/revisions\/183"}],"wp:attachment":[{"href":"https:\/\/soiltread.com\/pt\/wp-json\/wp\/v2\/media?parent=178"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/soiltread.com\/pt\/wp-json\/wp\/v2\/categories?post=178"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/soiltread.com\/pt\/wp-json\/wp\/v2\/tags?post=178"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}